Client: Anas S.p.A.
Role: Executive Design
Project Description: The assignment previews the relative executive planning to the area South Italy of the Street Infrastructures in management of ANAS Spa. for an estimated design amount of 5.000.000,00 euro.
RTI with
– S.T.E. s.r.l.
– Rocksoil S.p.A.
– E.D.IN. s.r.l.
– Prof. Arch. F. Karrer
ANAS – DG 40/16 – FORTORINA – Executive design of the project S.S. 212 – Completion work from the release of S. Marco dei Cavoti to S. Bartolomeo in Galdo – 1 Extract
ANAS – DG 40/16 – POTENZA-MELFI – Executive design for the intervention S.S. 658 “Power – Melfi”, works of the safety of the road in occasional stretches between Km 0+000 and Km 48+131, Extract 1B
ANAS – DG 40/16 – TELESINA – SS 372 Itinerary Caianello (A1) – Benevento, adaptation to 4 lanes of the SS 372 “Telesina” from km. 0+000 to km. 60+900. Lot 1: from km. 37+000 (junction of S. Salvatore Telesino) to km. 60+900 (junction of Benevento). Detail design.
ANAS – DG 40/16 – MARATEA – CERSUTA – Executive design for the intervention S.S. 18 “Tirrena Inferiore”, construction works of the sections in variant in the tunnel for the elimination of the risk of falling rocks in the locality Acquafredda and Cersuta (Maratea)
ANAS – DG 40/16 – MARATEA – ACQUAFREDDA Stralcio 1 Lot 1 – Executive planning for the intervention S.S. 18 “Tirrena Inferiore”, construction works of the sections in variant tunnel for the elimination of the danger of falling rocks in the locality Acquafredda (Maratea) – Excerpt 1 – Lot 1
ANAS – DG 40/16 – MARATEA – ACQUAFREDDA Stralcio 1 Lot 2 – Executive design for the intervention S.S. 18 “Tirrena Inferiore”, construction works of the sections in variant tunnel for the elimination of the risk of falling rocks in the locality Acquafredda (Maratea) – Excerpt 1 – Lot 2
ANAS – DG 40/16 – S. PANCRAZIO SALENTINO – Executive design for the project S.S. 7Ter Bradanico-Salentino itinerary. Modernisation work of the Manduria trunk – Lecce – Functional completion of the S. Pancrazio Salentino variant
ANAS – DG 40/16 – GARGANICA Executive design of the SS89 project – construction works for the road network of San Giovanni Rotondo and construction of the connecting pole from San Giovanni Rotondo to the capital of Dauno – 1° Stralcio Manfredonia – Amendola military airport.